Alameda Open Space Trailhead Site Plan Phase 1 - 2024
The site plan for Phase 1 of the Alameda & Rio Grande Open Space Trailhead Project. This includes removing existing trees and repair on an existing trail section (August 2024),as well as widening the existing asphalt trail and constructing a new asphalt trail (September 2024).