HVAC Energy Efficiency upgrades
- Total Annual Electrical avoided use: 2,290,192 kWh
- Total Annual heating oil avoided use: 500 gallons.
- Annual Reduction in CO2 emission equivalents: 5,301,101pounds (1,579 metric tons)
- Annual avoid cost of Electrical Purchases: $240,968.
- Budget: $1,270,044.
- Funding Source: 1% and 3% for Energy Conservation Set-A-Side for Capital Improvements
- Simple payback: 5.3 years (no inflation)
Locations:
- Pino Yards Used oil heater
- Arroyo del Oso Well VF motor
- Main Library Chiller
- Solid Waste maintenance facility used oil heater
- Transit Chiller
- HVAC Old City Hall
- Golf Center A/C efficiency upgrade
- Balloon Fiesta HVAC Replacement
- COA Police Department Forensic HVAC
- Upgrade Automated Controls
- COA Police Department Automated Controls & A/C replacement
- LEC Automated Controls
- LEC Air Conditioning Unit Replacement
- Thomas Bell Gym BAS/DDC
- Bio Park HVAC Efficiency Upgrade
- Library HVAC Efficiency Upgrade
- Design / Engineering West Side Animal HVAC Upgrade
- Design / Engineering Solid Waste HVAC Upgrade