Maxeon Solar Technologies, Maxeon Mesa Del Sol (MMDS)/Golden Eagle (Facility)
Maxeon Solar Technologies is requesting a new construction permit to construct and operate a new photovoltaic (PV) solar panel manufacturing facility (Facility). Photovoltaic solar panel cells are produced by delivering gases and liquid chemicals to processing tools that perform various processes on a silicon wafer substrate within the Cell Fabrication. The cells are then grouped into modules and interconnected to allow the panel to produce electricity within the Module Production area. The Facility is expected to manufacture about 5.8 million solar panels, corresponding to 3.5 gigawatts of power annually. Maxeon is requesting to operate 8,760 hours per year. The proposed manufacturing processes will include two (2) main production areas: The Cell Production area (CellFab) and the Module Production area (ModCo). Air emissions from the manufacturing processes will be controlled with scrubbers and other point of use control systems.
The facility will also include ancillary equipment such as natural gas boilers, diesel generators, fire pump and cooling towers.
Important Dates: Comment Period Start Date: December 8, 2023 Comment End Date: January 7, 2024 Decision Due Date: March 7, 2024
Related Documents · Application #3516 Maxeon Solar Technologies Permit Application · Application #3516 Maxeon Solar Technologies Public Notice in English · Application #3516 Maxeon Solar Technologies Aviso Publico en Espanol
|